Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13614567
![](http://i.b2b168.com/e/tag_pthy.gif)
- Product Categories
- Epoxy floor paint
- Concrete sealer
- Acrylic floor paint
- Polyurethane floor paint
- Vinyl ester floor paint
- The new cast epoxy material
- Epoxy Floor Project
- Anticorrosion coating works
- Friendly Links
Information Name: | FRP corrosion engineering |
Published: | 2015-04-06 |
Validity: | 365 |
Specifications: | 20 |
Quantity: | 99999.00 |
Price Description: | |
Detailed Product Description: | FRP corrosion engineering FRP corrosion engineering construction program anticorrosive epoxy fiberglass construction program I. Introduction This project is the construction of septic tanks brushing the surface of epoxy fiberglass cloth that three five oil. Corrosion engineering concrete construction is divided into the following steps: 1. Preparation: ① before construction to ensure the smooth concrete floor is completely dry basis, and then to carry out the work of the base oil painting. ② FRP raw materials needed to prepare the construction and construction equipment. 2, the specific construction program for three five oil cloth that primed again to be solidified and then brush again epoxy, glass cloth layer, the painted again, a layer of glass cloth, the painted again, and finally a layer of glass cloth painted ring Oxygen will cover a can. 3, product protection: As part of the pool filling class construction environment is not conducive to curing epoxy molding, it must take 48 hours of curing time, until completely cured immediately after use. Second, the construction plan follows a number of specialized anti-corrosion construction workers 5 2, foreman 1 (construction tools owned) Third, the construction quality requirements 1, according to the actual site to do all aspects of the construction work, mutual inspection and seizure in order to achieve quality requirements. 2, the construction workers during construction should be responsible for their own work, so that the quality of work continues to increase. Fourth, a fire safety measures, due to the construction of the raw materials used for flammable liquids, all access to the site of the construction workers are not smoking, smoking. 2, the construction workers to enter the site to comply with the rules and regulations, and obey foreman arrangements. 3, during brushing enamel were sent to the scene must have fresh air fan to keep the air fresh in the pool, or to wear gas masks in order to better construction. A fiberglass construction technology, construction ambient temperature operating conditions 5-25 ℃ appropriate, relative humidity less than 8%, fiberglass construction strict inspection before the foundation is flat ground, in the case of the ground is not completely dry can not be constructed due to construction ring actually has a low-pressure ventilation and lighting facilities in the basement so when necessary. Two, the primary requirements of the concrete surface of the concrete surface should be firm, dense, smooth, there should be from the sand, from the shell, cracks and other phenomena. The inner wall of concrete pools and other infrastructure using a wipe good, yin and yang angle should be beveled or rounded in order to achieve the purpose of construction and convenient. Third, the process operation 1, the preparation of the epoxy-resistant container should be kept clean, dry and free of grease. 2, the preparation of compounds, each project should be based on the amount of preparation and operation of the number may be, used with the distribution. 3, epoxy formulated by alcohol and T31 reach the degree of cure, the procedure is as follows: take a quantitative epoxy resin in the container, then add T31 curing agent, stir, with a good run out within 30 minutes. 4 layers of glass cloth brushing three times, the first time the application is complete the second step, followed by the construction to finish top coat. Can be used in the case of determining the top coat completely cured. Fourth, the quality requirements 1, after the completion of construction of epoxy anticorrosive surface of uniform color seamless coating bubbles and other phenomena. |
Admin>>>
You are the 14755 visitor
Copyright © GuangDong ICP No. 10089450, Jinan times Nice New Material Technology Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 14755 visitor
Copyright © GuangDong ICP No. 10089450, Jinan times Nice New Material Technology Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility